Presentation of Grygorii on 7.7.11 ---------------------------------- Topic: Results and conclusions from the beam tests with JAI-BM141 camera. Result of the discussion: JAI-BM141 was installed at HIGH1.Scr3 for a while and got radiation damage. Background level increased, not uniformely. This was never seen at Prosilicas. Grygorii will order 2 new cameras for further beam tests: - 1st should be installed at a position parallel to Prosilica readout (2nd beamline) for direct comparison, proposal: HIGH1.Scr1 - 2nd should be installed at beamlet observation screen to compare the resolution of details, proposal: HIGH1.Scr4 In order to avoid fast radiation damage, the shielding should be improved. Shielding at HIGH1.Scr3 should be checked, maybe non-uniforn distribution of noise level after radiation exposion can be explained by the setup. PS: After discussion with Galina, the easiest realisation of a parallel readout of Prosilica and JAI could be realized at PST.Scr1 (already 2 beamlines available). We should discuss this option.