==== KW 1 (31.12.2018 - 6.1.2019) ==== | ==== KW 1 (30.12.2019 - 5.1.2020) and KW 2 (6.1.2020 - 12.1.2020) ==== |
Line 15: | Line 15: |
23 of March - 5 of April: screen studies with HH | ==== KW 3 (13.1.2020 - 19.1.2020) and KW 4 (20.1.2020 - 26.1.2020) ==== Messbetrieb ==== KW 5 (27.1.2020 - 2.2.2020) and KW 6 (3.2.2020 - 9.2.2020) ==== Shutdown; folgende Arbeiten sind geplant: * Lecktest DDC-Umgebung (S.Maschmann) * Laseralignment (M.Gross) * Installation THz-Optik PST.Scr2 (G.Koss, P.Boonpornprasert) * Verkabelung rot. Spiegel LOW.Scr3 (M.Pohl) * Installation Kicker-PS (M.Pohl, S.Philipp) * Vermessung Tunnel vs. Tunnelannex am 30.1. (TI + extern) ==== KW 7 (10.2.2020 - 16.2.2020) and KW 8 (17.2..2020 - 23.2.2020) ==== Messbetrieb ==== KW 9 (24.2.2020 - 1.3.2020) and KW 10 (2.3.2020 - 8.3.2020) ==== Shutdown; KW 13/14: screen studies with HH KW 15/16: Kraninstallation 2.Tunnel |
vor2005 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Die Highlights des Jahres 2020 sind:
Im Folgenden die ausgeführten Arbeiten im Detail:
KW 1 (30.12.2019 - 5.1.2020) and KW 2 (6.1.2020 - 12.1.2020)
Shutdown
KW 3 (13.1.2020 - 19.1.2020) and KW 4 (20.1.2020 - 26.1.2020)
Messbetrieb
KW 5 (27.1.2020 - 2.2.2020) and KW 6 (3.2.2020 - 9.2.2020)
Shutdown; folgende Arbeiten sind geplant:
- Lecktest DDC-Umgebung (S.Maschmann)
- Laseralignment (M.Gross)
- Installation THz-Optik PST.Scr2 (G.Koss, P.Boonpornprasert)
- Verkabelung rot. Spiegel LOW.Scr3 (M.Pohl)
- Installation Kicker-PS (M.Pohl, S.Philipp)
- Vermessung Tunnel vs. Tunnelannex am 30.1. (TI + extern)
KW 7 (10.2.2020 - 16.2.2020) and KW 8 (17.2..2020 - 23.2.2020)
Messbetrieb
KW 9 (24.2.2020 - 1.3.2020) and KW 10 (2.3.2020 - 8.3.2020)
Shutdown;
KW 13/14: screen studies with HH KW 15/16: Kraninstallation 2.Tunnel